|
Sensors Install Usage and Attention
Items
●If have no special specifications, length of our sensor’s wire
will according to line of load strength and stress line o sensor
is coincident This will reduce the affect of incline load and eccentric
load minimum.
●Choose rate load of sensor you use according to sensor's measurement
range of this instruction.
●Shell protecting covering lead wire of sensor are all treated with
sealing users should not open them.
●To avoid chemical corrosion, it should daub Vaseline in the shell
of sensors, don’t use it under sunshine or have violent changement
of temperature,please install protecting equipments if can’t avoid
it.
●To avoid strong current passing and damaging sensor straightly,
it is for bided to electrowedlig during installation . Connecting
by-pass, made by copper wire, on two side of load equipment of sensor
when it is on special situation.
●Cable of sensor should far away form srong electric wire or pulsed
place, we it can’t avoid cable of sensor should pas through iron
tube solely and shorten the length of connection.
●Cable should not be extended yourself, when it need be extended
exactly, the Joint should be soldered and sealed and sealed with
moisture proof gum.
●Predating the sensors and apparatus for 30 minutes when they are
put us in high-precision situation
●The sensors should be placed In dry, airy and no corrosive air
room.
Other
●All the sensors of our company can be made into high temperature
sensors.
●Cells company can reserve the right of improving the products,
so if the sample may have some differences from the sighle pattern,
without notice.
|